March 14, 2011
Rankin-Hinds Pearl River Flood and Drainage Control District Board Chairman Gary Rhoads said that the U.S. Army Corps of Engineers is responsible for almost doubling the cost of a flood-control feasibility study.
March 14, 2011
Rankin-Hinds Pearl River Flood and Drainage Control District Board Chairman Gary Rhoads said that the U.S. Army Corps of Engineers is responsible for almost doubling the cost of a flood-control feasibility study.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID